Trusted Living Twin · The recordA demonstration on a fictional firm

Hollister Reed LLP

Every entry, its owner and its evidence.

Verified fraction

Printed state: every time state and every lens, in order.

0% verified: the share of 300 entries (253 nodes and 47 measured values) that were checked rather than asserted, as found on 14 October 2026 Trust posture: 1.2, Absent (verified: 0 of 25 scores) · Results since baseline: not yet measured again (signed: 0 of 5 drivers)
not yet measured at day ninety, 12 January 2027: the record holds no re-measurement yet; it holds 18 projected entries for this date, each drawn with its assumptions, and a projection is never measured Trust posture: projected: 2.1, Declared; not yet measured (18 of 25 levels are projected and 7 stand as judged) · Results since baseline: not yet measured again
not yet measured one year ahead: a projection is never measured; the record holds 18 projected entries, each drawn with its assumptions Trust posture: not yet measured · Results since baseline: not yet measured

The gaps, as found

14 October 2026, the record as found

SponsorWhere the firm stands, pillar by pillar ControllerEvery gap against the instrument, with its evidence OperatorThe gaps in the tools I use

Trust posture: 1.2, Absent; weakest pillars, tied at 1.0: Identity, Action and Orchestration; verified: 0 of 25 scores.

Sponsor lens

The five pillars

  • Identity Identity

    5 questions in instrument 0.1.0: 5 at level 1, Absent; pillar score 1.0.

  • Data Data

    5 questions in instrument 0.1.0: 2 at level 1, Absent; 3 at level 2, Declared; pillar score 1.6.

  • Infrastructure Infrastructure

    5 questions in instrument 0.1.0: 4 at level 1, Absent; 1 at level 2, Declared; pillar score 1.2.

  • Action Action

    5 questions in instrument 0.1.0: 5 at level 1, Absent; pillar score 1.0.

  • Orchestration Orchestration

    5 questions in instrument 0.1.0: 5 at level 1, Absent; pillar score 1.0.

Controller lens

The five pillars

  • Identity Identity

    5 questions in instrument 0.1.0: 5 at level 1, Absent; pillar score 1.0.

  • Data Data

    5 questions in instrument 0.1.0: 2 at level 1, Absent; 3 at level 2, Declared; pillar score 1.6.

  • Infrastructure Infrastructure

    5 questions in instrument 0.1.0: 4 at level 1, Absent; 1 at level 2, Declared; pillar score 1.2.

  • Action Action

    5 questions in instrument 0.1.0: 5 at level 1, Absent; pillar score 1.0.

  • Orchestration Orchestration

    5 questions in instrument 0.1.0: 5 at level 1, Absent; pillar score 1.0.

Against the instrument

  • Gap in Identity

    IdentityLevel 1, Absent

    No register existed; IT software inventory had no AI entries

    Judged by Dale Martin on 14 October 2026 against instrument 0.1.0
  • Gap in Identity

    IdentityLevel 1, Absent

    Nothing of the kind was found, and the sheet cites no evidence

    Judged by Dale Martin on 14 October 2026 against instrument 0.1.0
  • Gap in Identity

    IdentityLevel 1, Absent

    All use under personal or individual accounts; Copilot under user identities with no service identity

    Judged by Dale Martin on 14 October 2026 against instrument 0.1.0
  • Gap in Identity

    IdentityLevel 1, Absent

    Two departed users still licensed on the pilot

    Judged by Dale Martin on 14 October 2026 against instrument 0.1.0
  • Gap in Identity

    IdentityLevel 1, Absent

    No scope declared anywhere

    Judged by Dale Martin on 14 October 2026 against instrument 0.1.0
  • Gap in Data

    DataLevel 2, Declared

    Confidentiality policy classifies client data; no permitted-use guidance for AI

    Judged by Dale Martin on 14 October 2026 against instrument 0.1.0
  • Gap in Data

    DataLevel 1, Absent

    No practice; summaries and drafts carry no source

    Judged by Dale Martin on 14 October 2026 against instrument 0.1.0
  • Gap in Data

    DataLevel 2, Declared

    DNS logs show destinations on managed devices; no content visibility; no client-site coverage

    Judged by Dale Martin on 14 October 2026 against instrument 0.1.0
  • Gap in Data

    DataLevel 1, Absent

    Not applicable to current use; scored absent

    Judged by Dale Martin on 14 October 2026 against instrument 0.1.0
  • Gap in Data

    DataLevel 2, Declared

    Document-management retention configured; transcripts under a personal account with vendor default retention

    Judged by Dale Martin on 14 October 2026 against instrument 0.1.0
  • Gap in Infrastructure

    InfrastructureLevel 1, Absent

    No picture of AI connections; Copilot tenant undocumented

    Judged by Dale Martin on 14 October 2026 against instrument 0.1.0
  • Gap in Infrastructure

    InfrastructureLevel 2, Declared

    Copilot tenant logs exist for 20 users; nothing for consumer use

    Judged by Dale Martin on 14 October 2026 against instrument 0.1.0
  • Gap in Infrastructure

    InfrastructureLevel 1, Absent

    Never considered

    Judged by Dale Martin on 14 October 2026 against instrument 0.1.0
  • Gap in Infrastructure

    InfrastructureLevel 1, Absent

    Not applicable to current use; scored absent

    Judged by Dale Martin on 14 October 2026 against instrument 0.1.0
  • Gap in Infrastructure

    InfrastructureLevel 1, Absent

    No procedure; IT could revoke Copilot licenses on request

    Judged by Dale Martin on 14 October 2026 against instrument 0.1.0
  • Gap in Action

    ActionLevel 1, Absent

    Nothing written

    Judged by Dale Martin on 14 October 2026 against instrument 0.1.0
  • Gap in Action

    ActionLevel 1, Absent

    Professional review norms exist for signed work; nothing stated for AI drafts

    Judged by Dale Martin on 14 October 2026 against instrument 0.1.0
  • Gap in Action

    ActionLevel 1, Absent

    No record of what AI contributed to any deliverable

    Judged by Dale Martin on 14 October 2026 against instrument 0.1.0
  • Gap in Action

    ActionLevel 1, Absent

    No intent declared

    Judged by Dale Martin on 14 October 2026 against instrument 0.1.0
  • Gap in Action

    ActionLevel 1, Absent

    Nothing of the kind was found, and the sheet cites no evidence

    Judged by Dale Martin on 14 October 2026 against instrument 0.1.0
  • Gap in Orchestration

    OrchestrationLevel 1, Absent

    Quality and risk partner by default since August; no charter

    Judged by Dale Martin on 14 October 2026 against instrument 0.1.0
  • Gap in Orchestration

    OrchestrationLevel 1, Absent

    Copilot pilot had an email not a plan

    Judged by Dale Martin on 14 October 2026 against instrument 0.1.0
  • Gap in Orchestration

    OrchestrationLevel 1, Absent

    None; the register did not exist

    Judged by Dale Martin on 14 October 2026 against instrument 0.1.0
  • Gap in Orchestration

    OrchestrationLevel 1, Absent

    No AI incident has been recorded because none has been recognized

    Judged by Dale Martin on 14 October 2026 against instrument 0.1.0
  • Gap in Orchestration

    OrchestrationLevel 1, Absent

    Nothing of the kind was found, and the sheet cites no evidence

    Judged by Dale Martin on 14 October 2026 against instrument 0.1.0

In the register: structural gaps

  • Document summarization has no agent, no owner and no Tail Number

    Identitynot yet scoredstructural

    The tool is an AI product or feature that no agent in the register calls, so it has no agent, no owner and no Tail Number. An assessor declares an agent for it or retires it.

    Concerns Document summarization.

    Derived from the record: no agent calls this AI tool
  • Email and memo drafting (HRL-ADV-EML-0007) lacks owner, purpose, autonomy level, human checkpoints, and review date on its passport

    Identitynot yet scoredstructural

    The register holds HRL-ADV-EML-0007 with no owner, purpose, autonomy level, human checkpoints, or review date declared, so nobody has put on record who answers for it, what it is for, how far it acts on its own, where a person checks it, or when it is next reviewed.

    Concerns HRL-ADV-EML-0007, Email and memo drafting.

    Derived from the record: this agent's passport is incomplete
  • Client-call transcription (HRL-ADV-TRN-0003) lacks owner, purpose, autonomy level, human checkpoints, and review date on its passport

    Identitynot yet scoredstructural

    The register holds HRL-ADV-TRN-0003 with no owner, purpose, autonomy level, human checkpoints, or review date declared, so nobody has put on record who answers for it, what it is for, how far it acts on its own, where a person checks it, or when it is next reviewed.

    Concerns HRL-ADV-TRN-0003, Client-call transcription.

    Derived from the record: this agent's passport is incomplete
  • Management letter drafting (HRL-AUD-MLT-0002) lacks owner, purpose, autonomy level, human checkpoints, and review date on its passport

    Identitynot yet scoredstructural

    The register holds HRL-AUD-MLT-0002 with no owner, purpose, autonomy level, human checkpoints, or review date declared, so nobody has put on record who answers for it, what it is for, how far it acts on its own, where a person checks it, or when it is next reviewed.

    Concerns HRL-AUD-MLT-0002, Management letter drafting.

    Derived from the record: this agent's passport is incomplete
  • Routine client message answering (HRL-FIN-MSG-0011) lacks owner, purpose, autonomy level, human checkpoints, and review date on its passport

    Identitynot yet scoredstructural

    The register holds HRL-FIN-MSG-0011 with no owner, purpose, autonomy level, human checkpoints, or review date declared, so nobody has put on record who answers for it, what it is for, how far it acts on its own, where a person checks it, or when it is next reviewed.

    Concerns HRL-FIN-MSG-0011, Routine client message answering.

    Derived from the record: this agent's passport is incomplete
  • Copilot pilot (HRL-IT-CPL-0005) lacks purpose, autonomy level, human checkpoints, and review date on its passport

    Identitynot yet scoredstructural

    The register holds HRL-IT-CPL-0005 with no purpose, autonomy level, human checkpoints, or review date declared, so nobody has put on record what it is for, how far it acts on its own, where a person checks it, or when it is next reviewed.

    Concerns HRL-IT-CPL-0005, Copilot pilot.

    Derived from the record: this agent's passport is incomplete
  • Copilot pilot license, departed user (HRL-IT-CPL-0008) lacks owner, purpose, autonomy level, human checkpoints, and review date on its passport

    Identitynot yet scoredstructural

    The register holds HRL-IT-CPL-0008 with no owner, purpose, autonomy level, human checkpoints, or review date declared, so nobody has put on record who answers for it, what it is for, how far it acts on its own, where a person checks it, or when it is next reviewed.

    Concerns HRL-IT-CPL-0008, Copilot pilot license, departed user.

    Derived from the record: this agent's passport is incomplete
  • Copilot pilot license, departed user (HRL-IT-CPL-0009) lacks owner, purpose, autonomy level, human checkpoints, and review date on its passport

    Identitynot yet scoredstructural

    The register holds HRL-IT-CPL-0009 with no owner, purpose, autonomy level, human checkpoints, or review date declared, so nobody has put on record who answers for it, what it is for, how far it acts on its own, where a person checks it, or when it is next reviewed.

    Concerns HRL-IT-CPL-0009, Copilot pilot license, departed user.

    Derived from the record: this agent's passport is incomplete
  • Proposal drafting (HRL-MKT-PRO-0004) lacks purpose, autonomy level, human checkpoints, and review date on its passport

    Identitynot yet scoredstructural

    The register holds HRL-MKT-PRO-0004 with no purpose, autonomy level, human checkpoints, or review date declared, so nobody has put on record what it is for, how far it acts on its own, where a person checks it, or when it is next reviewed.

    Concerns HRL-MKT-PRO-0004, Proposal drafting.

    Derived from the record: this agent's passport is incomplete
  • Returning-client briefing (HRL-TAX-BRF-0010) lacks autonomy level, human checkpoints, and review date on its passport

    Identitynot yet scoredstructural

    The register holds HRL-TAX-BRF-0010 with no autonomy level, human checkpoints, or review date declared, so nobody has put on record how far it acts on its own, where a person checks it, or when it is next reviewed.

    Concerns HRL-TAX-BRF-0010, Returning-client briefing.

    Derived from the record: this agent's passport is incomplete
  • Prior-year return summarization (HRL-TAX-RET-0001) lacks owner, purpose, autonomy level, human checkpoints, and review date on its passport

    Identitynot yet scoredstructural

    The register holds HRL-TAX-RET-0001 with no owner, purpose, autonomy level, human checkpoints, or review date declared, so nobody has put on record who answers for it, what it is for, how far it acts on its own, where a person checks it, or when it is next reviewed.

    Concerns HRL-TAX-RET-0001, Prior-year return summarization.

    Derived from the record: this agent's passport is incomplete
  • Rule explanation and research (HRL-TAX-RSH-0006) lacks owner, purpose, autonomy level, human checkpoints, and review date on its passport

    Identitynot yet scoredstructural

    The register holds HRL-TAX-RSH-0006 with no owner, purpose, autonomy level, human checkpoints, or review date declared, so nobody has put on record who answers for it, what it is for, how far it acts on its own, where a person checks it, or when it is next reviewed.

    Concerns HRL-TAX-RSH-0006, Rule explanation and research.

    Derived from the record: this agent's passport is incomplete
  • Orrin Notes on EMP-0142's company card has no agent, no owner and no Tail Number

    Identitynot yet scoredstructural

    An AI subscription found in the card statements with no agent, no owner and no Tail Number.

    Concerns Orrin Notes (EMP-0142).

    The firm's files
  • Orrin Notes on EMP-0267's company card has no agent, no owner and no Tail Number

    Identitynot yet scoredstructural

    An AI subscription found in the card statements with no agent, no owner and no Tail Number.

    Concerns Orrin Notes (EMP-0267).

    The firm's files
  • Tessellate Slides on EMP-0012's company card has no agent, no owner and no Tail Number

    Identitynot yet scoredstructural

    An AI subscription found in the card statements with no agent, no owner and no Tail Number.

    Concerns Tessellate Slides (EMP-0012).

    The firm's files
  • Tessellate Slides on EMP-0350's company card has no agent, no owner and no Tail Number

    Identitynot yet scoredstructural

    An AI subscription found in the card statements with no agent, no owner and no Tail Number.

    Concerns Tessellate Slides (EMP-0350).

    The firm's files
  • Client message assistant serves no stated goal

    Orchestrationnot yet scoredstructural

    No stated goal of the firm is reached from this tool by an edge of the record, directly or through what it supports, so it is drawn unattached. A person ties it to a goal or retires it.

    Concerns Client message assistant.

    Derived from the record: this tool serves no stated goal
  • Copilot serves no stated goal

    Orchestrationnot yet scoredstructural

    No stated goal of the firm is reached from this tool by an edge of the record, directly or through what it supports, so it is drawn unattached. A person ties it to a goal or retires it.

    Concerns Copilot.

    Derived from the record: this tool serves no stated goal
  • Corvid Assistant serves no stated goal

    Orchestrationnot yet scoredstructural

    No stated goal of the firm is reached from this tool by an edge of the record, directly or through what it supports, so it is drawn unattached. A person ties it to a goal or retires it.

    Concerns Corvid Assistant.

    Derived from the record: this tool serves no stated goal
  • Meeting assistant serves no stated goal

    Orchestrationnot yet scoredstructural

    No stated goal of the firm is reached from this tool by an edge of the record, directly or through what it supports, so it is drawn unattached. A person ties it to a goal or retires it.

    Concerns Meeting assistant.

    Derived from the record: this tool serves no stated goal
  • Meeting transcription serves no stated goal

    Orchestrationnot yet scoredstructural

    No stated goal of the firm is reached from this tool by an edge of the record, directly or through what it supports, so it is drawn unattached. A person ties it to a goal or retires it.

    Concerns Meeting transcription.

    Derived from the record: this tool serves no stated goal
  • Keystone Office Cloud, Inc. serves no stated goal

    Orchestrationnot yet scoredstructural

    No stated goal of the firm is reached from this vendor by an edge of the record, directly or through what it supports, so it is drawn unattached. A person ties it to a goal or retires it.

    Concerns Keystone Office Cloud, Inc..

    Derived from the record: this vendor serves no stated goal
  • Practica Practice Management, Inc. serves no stated goal

    Orchestrationnot yet scoredstructural

    No stated goal of the firm is reached from this vendor by an edge of the record, directly or through what it supports, so it is drawn unattached. A person ties it to a goal or retires it.

    Concerns Practica Practice Management, Inc..

    Derived from the record: this vendor serves no stated goal
  • Archway Document Management, Inc. serves no stated goal

    Orchestrationnot yet scoredstructural

    No stated goal of the firm is reached from this vendor by an edge of the record, directly or through what it supports, so it is drawn unattached. A person ties it to a goal or retires it.

    Concerns Archway Document Management, Inc..

    Derived from the record: this vendor serves no stated goal
  • Confera Video, Inc. serves no stated goal

    Orchestrationnot yet scoredstructural

    No stated goal of the firm is reached from this vendor by an edge of the record, directly or through what it supports, so it is drawn unattached. A person ties it to a goal or retires it.

    Concerns Confera Video, Inc..

    Derived from the record: this vendor serves no stated goal
  • Corvid AI, Inc. serves no stated goal

    Orchestrationnot yet scoredstructural

    No stated goal of the firm is reached from this vendor by an edge of the record, directly or through what it supports, so it is drawn unattached. A person ties it to a goal or retires it.

    Concerns Corvid AI, Inc..

    Derived from the record: this vendor serves no stated goal
  • Tessellate, Inc. serves no stated goal

    Orchestrationnot yet scoredstructural

    No stated goal of the firm is reached from this vendor by an edge of the record, directly or through what it supports, so it is drawn unattached. A person ties it to a goal or retires it.

    Concerns Tessellate, Inc..

    Derived from the record: this vendor serves no stated goal
  • Orrin Technologies, Inc. serves no stated goal

    Orchestrationnot yet scoredstructural

    No stated goal of the firm is reached from this vendor by an edge of the record, directly or through what it supports, so it is drawn unattached. A person ties it to a goal or retires it.

    Concerns Orrin Technologies, Inc..

    Derived from the record: this vendor serves no stated goal
  • Client call notes serves no stated goal

    Orchestrationnot yet scoredstructural

    No stated goal of the firm is reached from this process by an edge of the record, directly or through what it supports, so it is drawn unattached. A person ties it to a goal or retires it.

    Concerns Client call notes.

    Derived from the record: this process serves no stated goal
  • Copilot pilot work serves no stated goal

    Orchestrationnot yet scoredstructural

    No stated goal of the firm is reached from this process by an edge of the record, directly or through what it supports, so it is drawn unattached. A person ties it to a goal or retires it.

    Concerns Copilot pilot work.

    Derived from the record: this process serves no stated goal
  • Email and memo drafting serves no stated goal

    Orchestrationnot yet scoredstructural

    No stated goal of the firm is reached from this process by an edge of the record, directly or through what it supports, so it is drawn unattached. A person ties it to a goal or retires it.

    Concerns Email and memo drafting.

    Derived from the record: this process serves no stated goal
  • Management letter drafting serves no stated goal

    Orchestrationnot yet scoredstructural

    No stated goal of the firm is reached from this process by an edge of the record, directly or through what it supports, so it is drawn unattached. A person ties it to a goal or retires it.

    Concerns Management letter drafting.

    Derived from the record: this process serves no stated goal
  • Prior-year return review serves no stated goal

    Orchestrationnot yet scoredstructural

    No stated goal of the firm is reached from this process by an edge of the record, directly or through what it supports, so it is drawn unattached. A person ties it to a goal or retires it.

    Concerns Prior-year return review.

    Derived from the record: this process serves no stated goal
  • Routine client messages serves no stated goal

    Orchestrationnot yet scoredstructural

    No stated goal of the firm is reached from this process by an edge of the record, directly or through what it supports, so it is drawn unattached. A person ties it to a goal or retires it.

    Concerns Routine client messages.

    Derived from the record: this process serves no stated goal
  • Tax and accounting rule research serves no stated goal

    Orchestrationnot yet scoredstructural

    No stated goal of the firm is reached from this process by an edge of the record, directly or through what it supports, so it is drawn unattached. A person ties it to a goal or retires it.

    Concerns Tax and accounting rule research.

    Derived from the record: this process serves no stated goal

Operator lens

Gaps in the register that touch my tools

  • Document summarization has no agent, no owner and no Tail Number

    Identitynot yet scoredstructural

    The tool is an AI product or feature that no agent in the register calls, so it has no agent, no owner and no Tail Number. An assessor declares an agent for it or retires it.

    Concerns Document summarization.

    Derived from the record: no agent calls this AI tool
  • Email and memo drafting (HRL-ADV-EML-0007) lacks owner, purpose, autonomy level, human checkpoints, and review date on its passport

    Identitynot yet scoredstructural

    The register holds HRL-ADV-EML-0007 with no owner, purpose, autonomy level, human checkpoints, or review date declared, so nobody has put on record who answers for it, what it is for, how far it acts on its own, where a person checks it, or when it is next reviewed.

    Concerns HRL-ADV-EML-0007, Email and memo drafting.

    Derived from the record: this agent's passport is incomplete
  • Client-call transcription (HRL-ADV-TRN-0003) lacks owner, purpose, autonomy level, human checkpoints, and review date on its passport

    Identitynot yet scoredstructural

    The register holds HRL-ADV-TRN-0003 with no owner, purpose, autonomy level, human checkpoints, or review date declared, so nobody has put on record who answers for it, what it is for, how far it acts on its own, where a person checks it, or when it is next reviewed.

    Concerns HRL-ADV-TRN-0003, Client-call transcription.

    Derived from the record: this agent's passport is incomplete
  • Management letter drafting (HRL-AUD-MLT-0002) lacks owner, purpose, autonomy level, human checkpoints, and review date on its passport

    Identitynot yet scoredstructural

    The register holds HRL-AUD-MLT-0002 with no owner, purpose, autonomy level, human checkpoints, or review date declared, so nobody has put on record who answers for it, what it is for, how far it acts on its own, where a person checks it, or when it is next reviewed.

    Concerns HRL-AUD-MLT-0002, Management letter drafting.

    Derived from the record: this agent's passport is incomplete
  • Routine client message answering (HRL-FIN-MSG-0011) lacks owner, purpose, autonomy level, human checkpoints, and review date on its passport

    Identitynot yet scoredstructural

    The register holds HRL-FIN-MSG-0011 with no owner, purpose, autonomy level, human checkpoints, or review date declared, so nobody has put on record who answers for it, what it is for, how far it acts on its own, where a person checks it, or when it is next reviewed.

    Concerns HRL-FIN-MSG-0011, Routine client message answering.

    Derived from the record: this agent's passport is incomplete
  • Copilot pilot (HRL-IT-CPL-0005) lacks purpose, autonomy level, human checkpoints, and review date on its passport

    Identitynot yet scoredstructural

    The register holds HRL-IT-CPL-0005 with no purpose, autonomy level, human checkpoints, or review date declared, so nobody has put on record what it is for, how far it acts on its own, where a person checks it, or when it is next reviewed.

    Concerns HRL-IT-CPL-0005, Copilot pilot.

    Derived from the record: this agent's passport is incomplete
  • Copilot pilot license, departed user (HRL-IT-CPL-0008) lacks owner, purpose, autonomy level, human checkpoints, and review date on its passport

    Identitynot yet scoredstructural

    The register holds HRL-IT-CPL-0008 with no owner, purpose, autonomy level, human checkpoints, or review date declared, so nobody has put on record who answers for it, what it is for, how far it acts on its own, where a person checks it, or when it is next reviewed.

    Concerns HRL-IT-CPL-0008, Copilot pilot license, departed user.

    Derived from the record: this agent's passport is incomplete
  • Copilot pilot license, departed user (HRL-IT-CPL-0009) lacks owner, purpose, autonomy level, human checkpoints, and review date on its passport

    Identitynot yet scoredstructural

    The register holds HRL-IT-CPL-0009 with no owner, purpose, autonomy level, human checkpoints, or review date declared, so nobody has put on record who answers for it, what it is for, how far it acts on its own, where a person checks it, or when it is next reviewed.

    Concerns HRL-IT-CPL-0009, Copilot pilot license, departed user.

    Derived from the record: this agent's passport is incomplete
  • Proposal drafting (HRL-MKT-PRO-0004) lacks purpose, autonomy level, human checkpoints, and review date on its passport

    Identitynot yet scoredstructural

    The register holds HRL-MKT-PRO-0004 with no purpose, autonomy level, human checkpoints, or review date declared, so nobody has put on record what it is for, how far it acts on its own, where a person checks it, or when it is next reviewed.

    Concerns HRL-MKT-PRO-0004, Proposal drafting.

    Derived from the record: this agent's passport is incomplete
  • Returning-client briefing (HRL-TAX-BRF-0010) lacks autonomy level, human checkpoints, and review date on its passport

    Identitynot yet scoredstructural

    The register holds HRL-TAX-BRF-0010 with no autonomy level, human checkpoints, or review date declared, so nobody has put on record how far it acts on its own, where a person checks it, or when it is next reviewed.

    Concerns HRL-TAX-BRF-0010, Returning-client briefing.

    Derived from the record: this agent's passport is incomplete
  • Prior-year return summarization (HRL-TAX-RET-0001) lacks owner, purpose, autonomy level, human checkpoints, and review date on its passport

    Identitynot yet scoredstructural

    The register holds HRL-TAX-RET-0001 with no owner, purpose, autonomy level, human checkpoints, or review date declared, so nobody has put on record who answers for it, what it is for, how far it acts on its own, where a person checks it, or when it is next reviewed.

    Concerns HRL-TAX-RET-0001, Prior-year return summarization.

    Derived from the record: this agent's passport is incomplete
  • Rule explanation and research (HRL-TAX-RSH-0006) lacks owner, purpose, autonomy level, human checkpoints, and review date on its passport

    Identitynot yet scoredstructural

    The register holds HRL-TAX-RSH-0006 with no owner, purpose, autonomy level, human checkpoints, or review date declared, so nobody has put on record who answers for it, what it is for, how far it acts on its own, where a person checks it, or when it is next reviewed.

    Concerns HRL-TAX-RSH-0006, Rule explanation and research.

    Derived from the record: this agent's passport is incomplete
  • Orrin Notes on EMP-0142's company card has no agent, no owner and no Tail Number

    Identitynot yet scoredstructural

    An AI subscription found in the card statements with no agent, no owner and no Tail Number.

    Concerns Orrin Notes (EMP-0142).

    The firm's files
  • Orrin Notes on EMP-0267's company card has no agent, no owner and no Tail Number

    Identitynot yet scoredstructural

    An AI subscription found in the card statements with no agent, no owner and no Tail Number.

    Concerns Orrin Notes (EMP-0267).

    The firm's files
  • Tessellate Slides on EMP-0012's company card has no agent, no owner and no Tail Number

    Identitynot yet scoredstructural

    An AI subscription found in the card statements with no agent, no owner and no Tail Number.

    Concerns Tessellate Slides (EMP-0012).

    The firm's files
  • Tessellate Slides on EMP-0350's company card has no agent, no owner and no Tail Number

    Identitynot yet scoredstructural

    An AI subscription found in the card statements with no agent, no owner and no Tail Number.

    Concerns Tessellate Slides (EMP-0350).

    The firm's files
  • Client message assistant serves no stated goal

    Orchestrationnot yet scoredstructural

    No stated goal of the firm is reached from this tool by an edge of the record, directly or through what it supports, so it is drawn unattached. A person ties it to a goal or retires it.

    Concerns Client message assistant.

    Derived from the record: this tool serves no stated goal
  • Copilot serves no stated goal

    Orchestrationnot yet scoredstructural

    No stated goal of the firm is reached from this tool by an edge of the record, directly or through what it supports, so it is drawn unattached. A person ties it to a goal or retires it.

    Concerns Copilot.

    Derived from the record: this tool serves no stated goal
  • Corvid Assistant serves no stated goal

    Orchestrationnot yet scoredstructural

    No stated goal of the firm is reached from this tool by an edge of the record, directly or through what it supports, so it is drawn unattached. A person ties it to a goal or retires it.

    Concerns Corvid Assistant.

    Derived from the record: this tool serves no stated goal
  • Meeting assistant serves no stated goal

    Orchestrationnot yet scoredstructural

    No stated goal of the firm is reached from this tool by an edge of the record, directly or through what it supports, so it is drawn unattached. A person ties it to a goal or retires it.

    Concerns Meeting assistant.

    Derived from the record: this tool serves no stated goal
  • Meeting transcription serves no stated goal

    Orchestrationnot yet scoredstructural

    No stated goal of the firm is reached from this tool by an edge of the record, directly or through what it supports, so it is drawn unattached. A person ties it to a goal or retires it.

    Concerns Meeting transcription.

    Derived from the record: this tool serves no stated goal
  • Keystone Office Cloud, Inc. serves no stated goal

    Orchestrationnot yet scoredstructural

    No stated goal of the firm is reached from this vendor by an edge of the record, directly or through what it supports, so it is drawn unattached. A person ties it to a goal or retires it.

    Concerns Keystone Office Cloud, Inc..

    Derived from the record: this vendor serves no stated goal
  • Practica Practice Management, Inc. serves no stated goal

    Orchestrationnot yet scoredstructural

    No stated goal of the firm is reached from this vendor by an edge of the record, directly or through what it supports, so it is drawn unattached. A person ties it to a goal or retires it.

    Concerns Practica Practice Management, Inc..

    Derived from the record: this vendor serves no stated goal
  • Archway Document Management, Inc. serves no stated goal

    Orchestrationnot yet scoredstructural

    No stated goal of the firm is reached from this vendor by an edge of the record, directly or through what it supports, so it is drawn unattached. A person ties it to a goal or retires it.

    Concerns Archway Document Management, Inc..

    Derived from the record: this vendor serves no stated goal
  • Confera Video, Inc. serves no stated goal

    Orchestrationnot yet scoredstructural

    No stated goal of the firm is reached from this vendor by an edge of the record, directly or through what it supports, so it is drawn unattached. A person ties it to a goal or retires it.

    Concerns Confera Video, Inc..

    Derived from the record: this vendor serves no stated goal
  • Corvid AI, Inc. serves no stated goal

    Orchestrationnot yet scoredstructural

    No stated goal of the firm is reached from this vendor by an edge of the record, directly or through what it supports, so it is drawn unattached. A person ties it to a goal or retires it.

    Concerns Corvid AI, Inc..

    Derived from the record: this vendor serves no stated goal
  • Tessellate, Inc. serves no stated goal

    Orchestrationnot yet scoredstructural

    No stated goal of the firm is reached from this vendor by an edge of the record, directly or through what it supports, so it is drawn unattached. A person ties it to a goal or retires it.

    Concerns Tessellate, Inc..

    Derived from the record: this vendor serves no stated goal
  • Orrin Technologies, Inc. serves no stated goal

    Orchestrationnot yet scoredstructural

    No stated goal of the firm is reached from this vendor by an edge of the record, directly or through what it supports, so it is drawn unattached. A person ties it to a goal or retires it.

    Concerns Orrin Technologies, Inc..

    Derived from the record: this vendor serves no stated goal
  • Client call notes serves no stated goal

    Orchestrationnot yet scoredstructural

    No stated goal of the firm is reached from this process by an edge of the record, directly or through what it supports, so it is drawn unattached. A person ties it to a goal or retires it.

    Concerns Client call notes.

    Derived from the record: this process serves no stated goal
  • Copilot pilot work serves no stated goal

    Orchestrationnot yet scoredstructural

    No stated goal of the firm is reached from this process by an edge of the record, directly or through what it supports, so it is drawn unattached. A person ties it to a goal or retires it.

    Concerns Copilot pilot work.

    Derived from the record: this process serves no stated goal
  • Email and memo drafting serves no stated goal

    Orchestrationnot yet scoredstructural

    No stated goal of the firm is reached from this process by an edge of the record, directly or through what it supports, so it is drawn unattached. A person ties it to a goal or retires it.

    Concerns Email and memo drafting.

    Derived from the record: this process serves no stated goal
  • Management letter drafting serves no stated goal

    Orchestrationnot yet scoredstructural

    No stated goal of the firm is reached from this process by an edge of the record, directly or through what it supports, so it is drawn unattached. A person ties it to a goal or retires it.

    Concerns Management letter drafting.

    Derived from the record: this process serves no stated goal
  • Prior-year return review serves no stated goal

    Orchestrationnot yet scoredstructural

    No stated goal of the firm is reached from this process by an edge of the record, directly or through what it supports, so it is drawn unattached. A person ties it to a goal or retires it.

    Concerns Prior-year return review.

    Derived from the record: this process serves no stated goal
  • Routine client messages serves no stated goal

    Orchestrationnot yet scoredstructural

    No stated goal of the firm is reached from this process by an edge of the record, directly or through what it supports, so it is drawn unattached. A person ties it to a goal or retires it.

    Concerns Routine client messages.

    Derived from the record: this process serves no stated goal
  • Tax and accounting rule research serves no stated goal

    Orchestrationnot yet scoredstructural

    No stated goal of the firm is reached from this process by an edge of the record, directly or through what it supports, so it is drawn unattached. A person ties it to a goal or retires it.

    Concerns Tax and accounting rule research.

    Derived from the record: this process serves no stated goal

Against the instrument

  • Gap in Identity

    IdentityLevel 1, Absent

    No register existed; IT software inventory had no AI entries

    Judged by Dale Martin on 14 October 2026 against instrument 0.1.0
  • Gap in Identity

    IdentityLevel 1, Absent

    Nothing of the kind was found, and the sheet cites no evidence

    Judged by Dale Martin on 14 October 2026 against instrument 0.1.0
  • Gap in Identity

    IdentityLevel 1, Absent

    All use under personal or individual accounts; Copilot under user identities with no service identity

    Judged by Dale Martin on 14 October 2026 against instrument 0.1.0
  • Gap in Identity

    IdentityLevel 1, Absent

    Two departed users still licensed on the pilot

    Judged by Dale Martin on 14 October 2026 against instrument 0.1.0
  • Gap in Identity

    IdentityLevel 1, Absent

    No scope declared anywhere

    Judged by Dale Martin on 14 October 2026 against instrument 0.1.0
  • Gap in Action

    ActionLevel 1, Absent

    Nothing written

    Judged by Dale Martin on 14 October 2026 against instrument 0.1.0
  • Gap in Action

    ActionLevel 1, Absent

    Professional review norms exist for signed work; nothing stated for AI drafts

    Judged by Dale Martin on 14 October 2026 against instrument 0.1.0
  • Gap in Action

    ActionLevel 1, Absent

    No record of what AI contributed to any deliverable

    Judged by Dale Martin on 14 October 2026 against instrument 0.1.0
  • Gap in Action

    ActionLevel 1, Absent

    No intent declared

    Judged by Dale Martin on 14 October 2026 against instrument 0.1.0
  • Gap in Action

    ActionLevel 1, Absent

    Nothing of the kind was found, and the sheet cites no evidence

    Judged by Dale Martin on 14 October 2026 against instrument 0.1.0

The gaps, at day ninety

12 January 2027, ninety days after as found; no re-measurement is recorded yet, so every entry in this state is a projection

SponsorWhat moved in ninety days ControllerEvery gap re-judged at the re-measurement OperatorWhat changed in the tools I use

Sponsor lens

  • Gap in ActionAssumption: Action 1 of the ninety-day plan lands: adopt the permitted-use matrix and say so, by 1 November 2026.Assumption: Elaine Marsh, managing partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.ActionLevel 3, Reported, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in ActionAssumption: Action 1 of the ninety-day plan lands: adopt the permitted-use matrix and say so, by 1 November 2026.Assumption: Elaine Marsh, managing partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.ActionLevel 3, Reported, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in ActionAssumption: Action 3 of the ninety-day plan lands: put the three manifests into force, by 15 November 2026.Assumption: Daniel Okoro, quality and risk partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.ActionLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in DataAssumption: Action 1 of the ninety-day plan lands: adopt the permitted-use matrix and say so, by 1 November 2026.Assumption: Elaine Marsh, managing partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.DataLevel 3, Reported, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in DataAssumption: Action 3 of the ninety-day plan lands: put the three manifests into force, by 15 November 2026.Assumption: Daniel Okoro, quality and risk partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.DataLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in DataAssumption: Action 3 of the ninety-day plan lands: put the three manifests into force, by 15 November 2026.Assumption: Daniel Okoro, quality and risk partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.DataLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in DataAssumption: Action 3 of the ninety-day plan lands: put the three manifests into force, by 15 November 2026.Assumption: Daniel Okoro, quality and risk partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.DataLevel 3, Reported, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in IdentityAssumption: Action 5 of the ninety-day plan lands: close the pilot's gaps and add two manifests, by 15 December 2026.Assumption: Luis Herrera, director of information technology, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.IdentityLevel 3, Reported, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in IdentityAssumption: Action 3 of the ninety-day plan lands: put the three manifests into force, by 15 November 2026.Assumption: Daniel Okoro, quality and risk partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.IdentityLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in IdentityAssumption: Action 5 of the ninety-day plan lands: close the pilot's gaps and add two manifests, by 15 December 2026.Assumption: Luis Herrera, director of information technology, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.IdentityLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in IdentityAssumption: Action 5 of the ninety-day plan lands: close the pilot's gaps and add two manifests, by 15 December 2026.Assumption: Luis Herrera, director of information technology, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.IdentityLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in InfrastructureAssumption: Action 5 of the ninety-day plan lands: close the pilot's gaps and add two manifests, by 15 December 2026.Assumption: Luis Herrera, director of information technology, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.InfrastructureLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in InfrastructureAssumption: Action 5 of the ninety-day plan lands: close the pilot's gaps and add two manifests, by 15 December 2026.Assumption: Luis Herrera, director of information technology, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.InfrastructureLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in OrchestrationAssumption: Action 2 of the ninety-day plan lands: charter the controller and the forum, by 3 November 2026.Assumption: Daniel Okoro, quality and risk partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.OrchestrationLevel 3, Reported, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in OrchestrationAssumption: Action 5 of the ninety-day plan lands: close the pilot's gaps and add two manifests, by 15 December 2026.Assumption: Luis Herrera, director of information technology, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.OrchestrationLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in OrchestrationAssumption: Action 2 of the ninety-day plan lands: charter the controller and the forum, by 3 November 2026.Assumption: Daniel Okoro, quality and risk partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.OrchestrationLevel 3, Reported, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in OrchestrationAssumption: Action 5 of the ninety-day plan lands: close the pilot's gaps and add two manifests, by 15 December 2026.Assumption: Luis Herrera, director of information technology, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.OrchestrationLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in OrchestrationAssumption: Action 2 of the ninety-day plan lands: charter the controller and the forum, by 3 November 2026.Assumption: Daniel Okoro, quality and risk partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.OrchestrationLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written

Controller lens

  • Gap in ActionAssumption: Action 1 of the ninety-day plan lands: adopt the permitted-use matrix and say so, by 1 November 2026.Assumption: Elaine Marsh, managing partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.ActionLevel 3, Reported, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in ActionAssumption: Action 1 of the ninety-day plan lands: adopt the permitted-use matrix and say so, by 1 November 2026.Assumption: Elaine Marsh, managing partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.ActionLevel 3, Reported, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in ActionAssumption: Action 3 of the ninety-day plan lands: put the three manifests into force, by 15 November 2026.Assumption: Daniel Okoro, quality and risk partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.ActionLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in DataAssumption: Action 1 of the ninety-day plan lands: adopt the permitted-use matrix and say so, by 1 November 2026.Assumption: Elaine Marsh, managing partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.DataLevel 3, Reported, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in DataAssumption: Action 3 of the ninety-day plan lands: put the three manifests into force, by 15 November 2026.Assumption: Daniel Okoro, quality and risk partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.DataLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in DataAssumption: Action 3 of the ninety-day plan lands: put the three manifests into force, by 15 November 2026.Assumption: Daniel Okoro, quality and risk partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.DataLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in DataAssumption: Action 3 of the ninety-day plan lands: put the three manifests into force, by 15 November 2026.Assumption: Daniel Okoro, quality and risk partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.DataLevel 3, Reported, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in IdentityAssumption: Action 5 of the ninety-day plan lands: close the pilot's gaps and add two manifests, by 15 December 2026.Assumption: Luis Herrera, director of information technology, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.IdentityLevel 3, Reported, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in IdentityAssumption: Action 3 of the ninety-day plan lands: put the three manifests into force, by 15 November 2026.Assumption: Daniel Okoro, quality and risk partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.IdentityLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in IdentityAssumption: Action 5 of the ninety-day plan lands: close the pilot's gaps and add two manifests, by 15 December 2026.Assumption: Luis Herrera, director of information technology, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.IdentityLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in IdentityAssumption: Action 5 of the ninety-day plan lands: close the pilot's gaps and add two manifests, by 15 December 2026.Assumption: Luis Herrera, director of information technology, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.IdentityLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in InfrastructureAssumption: Action 5 of the ninety-day plan lands: close the pilot's gaps and add two manifests, by 15 December 2026.Assumption: Luis Herrera, director of information technology, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.InfrastructureLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in InfrastructureAssumption: Action 5 of the ninety-day plan lands: close the pilot's gaps and add two manifests, by 15 December 2026.Assumption: Luis Herrera, director of information technology, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.InfrastructureLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in OrchestrationAssumption: Action 2 of the ninety-day plan lands: charter the controller and the forum, by 3 November 2026.Assumption: Daniel Okoro, quality and risk partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.OrchestrationLevel 3, Reported, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in OrchestrationAssumption: Action 5 of the ninety-day plan lands: close the pilot's gaps and add two manifests, by 15 December 2026.Assumption: Luis Herrera, director of information technology, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.OrchestrationLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in OrchestrationAssumption: Action 2 of the ninety-day plan lands: charter the controller and the forum, by 3 November 2026.Assumption: Daniel Okoro, quality and risk partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.OrchestrationLevel 3, Reported, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in OrchestrationAssumption: Action 5 of the ninety-day plan lands: close the pilot's gaps and add two manifests, by 15 December 2026.Assumption: Luis Herrera, director of information technology, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.OrchestrationLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in OrchestrationAssumption: Action 2 of the ninety-day plan lands: charter the controller and the forum, by 3 November 2026.Assumption: Daniel Okoro, quality and risk partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.OrchestrationLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written

Operator lens

  • Gap in ActionAssumption: Action 1 of the ninety-day plan lands: adopt the permitted-use matrix and say so, by 1 November 2026.Assumption: Elaine Marsh, managing partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.ActionLevel 3, Reported, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in ActionAssumption: Action 1 of the ninety-day plan lands: adopt the permitted-use matrix and say so, by 1 November 2026.Assumption: Elaine Marsh, managing partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.ActionLevel 3, Reported, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in ActionAssumption: Action 3 of the ninety-day plan lands: put the three manifests into force, by 15 November 2026.Assumption: Daniel Okoro, quality and risk partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.ActionLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in DataAssumption: Action 1 of the ninety-day plan lands: adopt the permitted-use matrix and say so, by 1 November 2026.Assumption: Elaine Marsh, managing partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.DataLevel 3, Reported, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in DataAssumption: Action 3 of the ninety-day plan lands: put the three manifests into force, by 15 November 2026.Assumption: Daniel Okoro, quality and risk partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.DataLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in DataAssumption: Action 3 of the ninety-day plan lands: put the three manifests into force, by 15 November 2026.Assumption: Daniel Okoro, quality and risk partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.DataLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in DataAssumption: Action 3 of the ninety-day plan lands: put the three manifests into force, by 15 November 2026.Assumption: Daniel Okoro, quality and risk partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.DataLevel 3, Reported, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in IdentityAssumption: Action 5 of the ninety-day plan lands: close the pilot's gaps and add two manifests, by 15 December 2026.Assumption: Luis Herrera, director of information technology, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.IdentityLevel 3, Reported, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in IdentityAssumption: Action 3 of the ninety-day plan lands: put the three manifests into force, by 15 November 2026.Assumption: Daniel Okoro, quality and risk partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.IdentityLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in IdentityAssumption: Action 5 of the ninety-day plan lands: close the pilot's gaps and add two manifests, by 15 December 2026.Assumption: Luis Herrera, director of information technology, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.IdentityLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in IdentityAssumption: Action 5 of the ninety-day plan lands: close the pilot's gaps and add two manifests, by 15 December 2026.Assumption: Luis Herrera, director of information technology, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.IdentityLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in InfrastructureAssumption: Action 5 of the ninety-day plan lands: close the pilot's gaps and add two manifests, by 15 December 2026.Assumption: Luis Herrera, director of information technology, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.InfrastructureLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in InfrastructureAssumption: Action 5 of the ninety-day plan lands: close the pilot's gaps and add two manifests, by 15 December 2026.Assumption: Luis Herrera, director of information technology, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.InfrastructureLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in OrchestrationAssumption: Action 2 of the ninety-day plan lands: charter the controller and the forum, by 3 November 2026.Assumption: Daniel Okoro, quality and risk partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.OrchestrationLevel 3, Reported, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in OrchestrationAssumption: Action 5 of the ninety-day plan lands: close the pilot's gaps and add two manifests, by 15 December 2026.Assumption: Luis Herrera, director of information technology, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.OrchestrationLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in OrchestrationAssumption: Action 2 of the ninety-day plan lands: charter the controller and the forum, by 3 November 2026.Assumption: Daniel Okoro, quality and risk partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.OrchestrationLevel 3, Reported, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in OrchestrationAssumption: Action 5 of the ninety-day plan lands: close the pilot's gaps and add two manifests, by 15 December 2026.Assumption: Luis Herrera, director of information technology, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.OrchestrationLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in OrchestrationAssumption: Action 2 of the ninety-day plan lands: charter the controller and the forum, by 3 November 2026.Assumption: Daniel Okoro, quality and risk partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.OrchestrationLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written

Assumptions behind this projection

  1. Action 1 of the ninety-day plan lands: adopt the permitted-use matrix and say so, by 1 November 2026.
  2. Elaine Marsh, managing partner, owns that action.
  3. The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.
  4. Action 3 of the ninety-day plan lands: put the three manifests into force, by 15 November 2026.
  5. Daniel Okoro, quality and risk partner, owns that action.
  6. Action 5 of the ninety-day plan lands: close the pilot's gaps and add two manifests, by 15 December 2026.
  7. Luis Herrera, director of information technology, owns that action.
  8. Action 2 of the ninety-day plan lands: charter the controller and the forum, by 3 November 2026.

The gaps, one year ahead, projected

14 October 2027; every entry in this state is a projection

SponsorWhere the firm expects to stand in a year ControllerThe levels targeted at the next annual re-measurement OperatorWhat my tools are expected to meet

Sponsor lens

  • Gap in ActionAssumption: Action 1 of the ninety-day plan lands: adopt the permitted-use matrix and say so, by 1 November 2026.Assumption: Elaine Marsh, managing partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.ActionLevel 3, Reported, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in ActionAssumption: Action 1 of the ninety-day plan lands: adopt the permitted-use matrix and say so, by 1 November 2026.Assumption: Elaine Marsh, managing partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.ActionLevel 3, Reported, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in ActionAssumption: Action 3 of the ninety-day plan lands: put the three manifests into force, by 15 November 2026.Assumption: Daniel Okoro, quality and risk partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.ActionLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in DataAssumption: Action 1 of the ninety-day plan lands: adopt the permitted-use matrix and say so, by 1 November 2026.Assumption: Elaine Marsh, managing partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.DataLevel 3, Reported, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in DataAssumption: Action 3 of the ninety-day plan lands: put the three manifests into force, by 15 November 2026.Assumption: Daniel Okoro, quality and risk partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.DataLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in DataAssumption: Action 3 of the ninety-day plan lands: put the three manifests into force, by 15 November 2026.Assumption: Daniel Okoro, quality and risk partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.DataLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in DataAssumption: Action 3 of the ninety-day plan lands: put the three manifests into force, by 15 November 2026.Assumption: Daniel Okoro, quality and risk partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.DataLevel 3, Reported, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in IdentityAssumption: Action 5 of the ninety-day plan lands: close the pilot's gaps and add two manifests, by 15 December 2026.Assumption: Luis Herrera, director of information technology, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.IdentityLevel 3, Reported, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in IdentityAssumption: Action 3 of the ninety-day plan lands: put the three manifests into force, by 15 November 2026.Assumption: Daniel Okoro, quality and risk partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.IdentityLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in IdentityAssumption: Action 5 of the ninety-day plan lands: close the pilot's gaps and add two manifests, by 15 December 2026.Assumption: Luis Herrera, director of information technology, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.IdentityLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in IdentityAssumption: Action 5 of the ninety-day plan lands: close the pilot's gaps and add two manifests, by 15 December 2026.Assumption: Luis Herrera, director of information technology, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.IdentityLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in InfrastructureAssumption: Action 5 of the ninety-day plan lands: close the pilot's gaps and add two manifests, by 15 December 2026.Assumption: Luis Herrera, director of information technology, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.InfrastructureLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in InfrastructureAssumption: Action 5 of the ninety-day plan lands: close the pilot's gaps and add two manifests, by 15 December 2026.Assumption: Luis Herrera, director of information technology, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.InfrastructureLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in OrchestrationAssumption: Action 2 of the ninety-day plan lands: charter the controller and the forum, by 3 November 2026.Assumption: Daniel Okoro, quality and risk partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.OrchestrationLevel 3, Reported, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in OrchestrationAssumption: Action 5 of the ninety-day plan lands: close the pilot's gaps and add two manifests, by 15 December 2026.Assumption: Luis Herrera, director of information technology, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.OrchestrationLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in OrchestrationAssumption: Action 2 of the ninety-day plan lands: charter the controller and the forum, by 3 November 2026.Assumption: Daniel Okoro, quality and risk partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.OrchestrationLevel 3, Reported, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in OrchestrationAssumption: Action 5 of the ninety-day plan lands: close the pilot's gaps and add two manifests, by 15 December 2026.Assumption: Luis Herrera, director of information technology, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.OrchestrationLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in OrchestrationAssumption: Action 2 of the ninety-day plan lands: charter the controller and the forum, by 3 November 2026.Assumption: Daniel Okoro, quality and risk partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.OrchestrationLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written

Controller lens

  • Gap in ActionAssumption: Action 1 of the ninety-day plan lands: adopt the permitted-use matrix and say so, by 1 November 2026.Assumption: Elaine Marsh, managing partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.ActionLevel 3, Reported, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in ActionAssumption: Action 1 of the ninety-day plan lands: adopt the permitted-use matrix and say so, by 1 November 2026.Assumption: Elaine Marsh, managing partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.ActionLevel 3, Reported, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in ActionAssumption: Action 3 of the ninety-day plan lands: put the three manifests into force, by 15 November 2026.Assumption: Daniel Okoro, quality and risk partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.ActionLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in DataAssumption: Action 1 of the ninety-day plan lands: adopt the permitted-use matrix and say so, by 1 November 2026.Assumption: Elaine Marsh, managing partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.DataLevel 3, Reported, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in DataAssumption: Action 3 of the ninety-day plan lands: put the three manifests into force, by 15 November 2026.Assumption: Daniel Okoro, quality and risk partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.DataLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in DataAssumption: Action 3 of the ninety-day plan lands: put the three manifests into force, by 15 November 2026.Assumption: Daniel Okoro, quality and risk partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.DataLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in DataAssumption: Action 3 of the ninety-day plan lands: put the three manifests into force, by 15 November 2026.Assumption: Daniel Okoro, quality and risk partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.DataLevel 3, Reported, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in IdentityAssumption: Action 5 of the ninety-day plan lands: close the pilot's gaps and add two manifests, by 15 December 2026.Assumption: Luis Herrera, director of information technology, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.IdentityLevel 3, Reported, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in IdentityAssumption: Action 3 of the ninety-day plan lands: put the three manifests into force, by 15 November 2026.Assumption: Daniel Okoro, quality and risk partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.IdentityLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in IdentityAssumption: Action 5 of the ninety-day plan lands: close the pilot's gaps and add two manifests, by 15 December 2026.Assumption: Luis Herrera, director of information technology, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.IdentityLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in IdentityAssumption: Action 5 of the ninety-day plan lands: close the pilot's gaps and add two manifests, by 15 December 2026.Assumption: Luis Herrera, director of information technology, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.IdentityLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in InfrastructureAssumption: Action 5 of the ninety-day plan lands: close the pilot's gaps and add two manifests, by 15 December 2026.Assumption: Luis Herrera, director of information technology, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.InfrastructureLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in InfrastructureAssumption: Action 5 of the ninety-day plan lands: close the pilot's gaps and add two manifests, by 15 December 2026.Assumption: Luis Herrera, director of information technology, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.InfrastructureLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in OrchestrationAssumption: Action 2 of the ninety-day plan lands: charter the controller and the forum, by 3 November 2026.Assumption: Daniel Okoro, quality and risk partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.OrchestrationLevel 3, Reported, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in OrchestrationAssumption: Action 5 of the ninety-day plan lands: close the pilot's gaps and add two manifests, by 15 December 2026.Assumption: Luis Herrera, director of information technology, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.OrchestrationLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in OrchestrationAssumption: Action 2 of the ninety-day plan lands: charter the controller and the forum, by 3 November 2026.Assumption: Daniel Okoro, quality and risk partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.OrchestrationLevel 3, Reported, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in OrchestrationAssumption: Action 5 of the ninety-day plan lands: close the pilot's gaps and add two manifests, by 15 December 2026.Assumption: Luis Herrera, director of information technology, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.OrchestrationLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in OrchestrationAssumption: Action 2 of the ninety-day plan lands: charter the controller and the forum, by 3 November 2026.Assumption: Daniel Okoro, quality and risk partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.OrchestrationLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written

Operator lens

  • Gap in ActionAssumption: Action 1 of the ninety-day plan lands: adopt the permitted-use matrix and say so, by 1 November 2026.Assumption: Elaine Marsh, managing partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.ActionLevel 3, Reported, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in ActionAssumption: Action 1 of the ninety-day plan lands: adopt the permitted-use matrix and say so, by 1 November 2026.Assumption: Elaine Marsh, managing partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.ActionLevel 3, Reported, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in ActionAssumption: Action 3 of the ninety-day plan lands: put the three manifests into force, by 15 November 2026.Assumption: Daniel Okoro, quality and risk partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.ActionLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in DataAssumption: Action 1 of the ninety-day plan lands: adopt the permitted-use matrix and say so, by 1 November 2026.Assumption: Elaine Marsh, managing partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.DataLevel 3, Reported, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in DataAssumption: Action 3 of the ninety-day plan lands: put the three manifests into force, by 15 November 2026.Assumption: Daniel Okoro, quality and risk partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.DataLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in DataAssumption: Action 3 of the ninety-day plan lands: put the three manifests into force, by 15 November 2026.Assumption: Daniel Okoro, quality and risk partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.DataLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in DataAssumption: Action 3 of the ninety-day plan lands: put the three manifests into force, by 15 November 2026.Assumption: Daniel Okoro, quality and risk partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.DataLevel 3, Reported, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in IdentityAssumption: Action 5 of the ninety-day plan lands: close the pilot's gaps and add two manifests, by 15 December 2026.Assumption: Luis Herrera, director of information technology, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.IdentityLevel 3, Reported, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in IdentityAssumption: Action 3 of the ninety-day plan lands: put the three manifests into force, by 15 November 2026.Assumption: Daniel Okoro, quality and risk partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.IdentityLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in IdentityAssumption: Action 5 of the ninety-day plan lands: close the pilot's gaps and add two manifests, by 15 December 2026.Assumption: Luis Herrera, director of information technology, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.IdentityLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in IdentityAssumption: Action 5 of the ninety-day plan lands: close the pilot's gaps and add two manifests, by 15 December 2026.Assumption: Luis Herrera, director of information technology, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.IdentityLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in InfrastructureAssumption: Action 5 of the ninety-day plan lands: close the pilot's gaps and add two manifests, by 15 December 2026.Assumption: Luis Herrera, director of information technology, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.InfrastructureLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in InfrastructureAssumption: Action 5 of the ninety-day plan lands: close the pilot's gaps and add two manifests, by 15 December 2026.Assumption: Luis Herrera, director of information technology, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.InfrastructureLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in OrchestrationAssumption: Action 2 of the ninety-day plan lands: charter the controller and the forum, by 3 November 2026.Assumption: Daniel Okoro, quality and risk partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.OrchestrationLevel 3, Reported, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in OrchestrationAssumption: Action 5 of the ninety-day plan lands: close the pilot's gaps and add two manifests, by 15 December 2026.Assumption: Luis Herrera, director of information technology, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.OrchestrationLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in OrchestrationAssumption: Action 2 of the ninety-day plan lands: charter the controller and the forum, by 3 November 2026.Assumption: Daniel Okoro, quality and risk partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.OrchestrationLevel 3, Reported, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in OrchestrationAssumption: Action 5 of the ninety-day plan lands: close the pilot's gaps and add two manifests, by 15 December 2026.Assumption: Luis Herrera, director of information technology, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.OrchestrationLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written
  • Gap in OrchestrationAssumption: Action 2 of the ninety-day plan lands: charter the controller and the forum, by 3 November 2026.Assumption: Daniel Okoro, quality and risk partner, owns that action.Assumption: The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.OrchestrationLevel 2, Declared, projectedProjected from the assessor's sheet of scores: the plan's target for this question at day ninety, 12 January 2027, set when the plan was written

Assumptions behind this projection

  1. Action 1 of the ninety-day plan lands: adopt the permitted-use matrix and say so, by 1 November 2026.
  2. Elaine Marsh, managing partner, owns that action.
  3. The level is the target the assessor's sheet of scores set for this question at day ninety, on 14 October 2026; it is not a measurement until a re-judgment dated day ninety enters the record.
  4. Action 3 of the ninety-day plan lands: put the three manifests into force, by 15 November 2026.
  5. Daniel Okoro, quality and risk partner, owns that action.
  6. Action 5 of the ninety-day plan lands: close the pilot's gaps and add two manifests, by 15 December 2026.
  7. Luis Herrera, director of information technology, owns that action.
  8. Action 2 of the ninety-day plan lands: charter the controller and the forum, by 3 November 2026.